|
Institution: Mindanao State University – Iligan Institute of Technology (²ÝÝ®ÊÓÆµ) Deadline for Application: January 16, 2026; 5:00 PM Project Title: Development of Electromagnetic Shielding Porous Geopolymer Composite with Hydrothermally Synthesized Carbon from Agricultural Wastes) Project Leader: Ruben L. Menchavez, Dr. Eng. Duration: Six (6) months starting from February to July 2026 Salary: Php 15,208.80/month Tentative schedule of interview: January 19, 2026 (afternoon)
Qualifications:
- Graduate of BS Ceramic Engineering
Duties and Responsibilities:
- Attend project meetings
- Conduct experiments according to protocols and maintain laboratory equipment
- Collect and log experimental data
- Assist in data analysis and interpreting experimental results
- Prepare progress reports of the experiment
- Assist in research publications and prepare presentations for the project leader
Interested and qualified applicants should signify their interest in writing. Please attach the following documents to the application letter and send it to the address below:
- Resume/Curriculum Vitae;
- TOR/Evaluation of Grades;
- Photocopy of Valid ID of the person to hire, and;
- Application Letter indicating the subject below:
Subject: Research Assistant for the project led by Prof. Ruben L. Menchavez
____
QUALIFIED APPLICANTS are advised to hand in three (3) copies of their application to the Office of Research Management, OVCRE and address it to:
PROF. ALIZEDNEY M. DITUCALAN, J.D. LL.D. Chancellor MSU - Iligan Institute of Technology
Through:
PROF. EPHRIME B. METILLO. PhD Vice Chancellor for Research and Enterprise
PROF. ARNOLD C. ALGUNO, PhD Director, Office of Research Management
____
APPLICATIONS WITH INCOMPLETE DOCUMENTS SHALL NOT BE ENTERTAINED.
²ÝÝ®ÊÓÆµ accepts all qualified applicants including persons with disability (PWD), members of indigenous communities (IP) and those from any sexual orientation and gender identities (SOG).
NOTE: For Applicants who will hand in or send their applications through courier, PLEASE COMPILE THREE (3) COPIES OF THE COMPLETE DOCUMENTS IN LONG WHITE FOLDER WITH PAPER FASTENER |